Customization: | Available |
---|---|
Transmission Type: | Manual |
Power: | Diesel |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Truck Specification | ||||||||
Cab | Single row cab, with power steering.,with a/c | |||||||
Driving Type | 4*2 Left hand driving | |||||||
Overall dimension(mm) | 7980*2430*3450 | |||||||
GVW( kg) | 15000 | |||||||
Wheelbase(mm) | 4700 | |||||||
Tire | 9.00-20 (6+1) | |||||||
Gear box | 6-speed | |||||||
Bridge | Front axle | 5T | ||||||
Rear axle | 10T | |||||||
Enging | Model | B170-33 | ||||||
Fuel Type | Diesel fuel | |||||||
Type | Water-cooled four-stroke,, direct injection, turbocharged | |||||||
Exhaust(ml) | 5700 | |||||||
Max output power/rotate speed (hp /rpm ) | 170/2500 | |||||||
Braking system | Service Brake | Compressed air brake | ||||||
Park Brake | Spring energy | |||||||
Auxiliary brake | engine exhaust brake | |||||||
Eletric system | 24v | |||||||
LPG TANK specification | ||||||||
Design specific gravity | 0.42 Kg/L | |||||||
Tank material | Q345R | |||||||
Tank Designed thickness | End cover | 9.35mm | ||||||
Tank body | 9.37mm | |||||||
Design temperature | 50 0C | |||||||
working temperature | 20~50 0C | |||||||
Corrosion allowance | 1.0mm | |||||||
Designed pressure | 1.77Mpa | |||||||
Hydraulic test pressure | 2.30MPa | |||||||
Leak test pressure | 1.77Mpa | |||||||
Heat treatment | Wholly get rid of stress | |||||||
Use Years | Ten years | |||||||
LPG dispenser | Function | Dispenser LPG to LPG cylinder or other LPG truck | ||||||
Flow rate | 10 ~ 60L/min | |||||||
Max working pressure | 2.5Mpa | |||||||
LPG pump | Function | Delivery and pump LPG | ||||||
Flow rate | 30-80L/min | |||||||
Working pressure | 1.60Mpa | |||||||
Liquid level meter | Type | Rotary | ||||||
Model | YWG-2.5 | |||||||
Nominal pressure | PN2.5Mpa | |||||||
Surveying range | 50-2300mm | |||||||
Precision | 2.5Grade | |||||||
Emergency cutting valve | Type | Gas phase | QCJ43F-2.5-8 | |||||
Liquid phase | QCJ43F-2.5-7 | |||||||
Nominal pressure | PN2.5Mpa | |||||||
Nominal diameter | Gas phase | DN25mm | ||||||
Liquid phase | DN50mm | |||||||
Operation way | Fluid pressure | |||||||
Closing time | ≤10 Sec | |||||||
Melting switch temperature | 70±5°C | |||||||
Safe valve | Type | A412F-2.5-16 | ||||||
Model | Inner full lift | |||||||
Nominal pressure | PN2.5 MPa | |||||||
Nominal diameter | DN50 | |||||||
Opening pressure | 1.7MPa | |||||||
Closing pressure | 1.86-1.94MPa | |||||||
Complete opening pressure | <2.12 MPa | |||||||
Loading and unloading device | Valve type | Gas phase |
YKAG-3.3-6
|
|||||
Liquid phase |
YKAG-3.3-7
|
|||||||
Model | Quick tie-in | |||||||
Nominal Diameter | Gas phase | DN25mm | ||||||
Liquid phase | DN50mm | |||||||
Pressure meter | YN-100T | |||||||
Temperature gauge | WTQ-280 | |||||||
Other equipment | ||||||||
1.double tool box 2.double valve box 3.double Emergency Cut-off Valve 4.single pipe liquid out 5.both side loading and unloading |
Murphy Tang
Export Director